Project 023 · South East Melbourne
Palms set on a fresh cut
Groundwork

The job
Palms stood on a fresh cut, with an excavator still on site and concrete steps in the foreground.
The site
The cut is open and the levels are still being worked.
How it finished
Palms set on the new level while the ground around them is still unfinished.